Open beta testing has begun.
✅ Forest map with 101 thousand trees (birch, pine, spruce, oak, beech).
- 30 plots of 5 hectares each
- 30 plots of 10 hectares each
- an old base where you need to restore the house and build a small sawmill
- an old barn that needs to be rebuilt
- an old sawmill, which is also subject to reconstruction
- a farm with beds and storage of preserves
- two small collections
✅ All purchase/sale points are located at the railway station.
✅ For construction and restoration, you will need to purchase sheet metal from Semenych’s warehouse, and tools and construction iron from the store.
✅ You can sell bulk products at Stepanych’s elevator. Mikhalych is in charge of the tree. And processed and packaged products are accepted by Dmitrich.
✅ The territory cleared from the forest can be developed for fields, animal pens and production. For this purpose, there is a set of projects for independent construction of production facilities, warehouses, and animal pens. Examples of constructed objects from the addition to the map can be viewed on the telegram channel https://t.me/ModsFarmingSimulators using the tag #constructibles.
The author of the card idea is BULDOZER_221 (https://t.me/buldozer221)
ATTENTION! There is an addition to this map - “A set of projects for houses, industries, and animal shelters.” (FS25_AbandonedTaiga_BuildingsUnderConstruction)
- 0 Likes
- 0 Comments
- 6 Downloads
-
6 Downloads in
-
1 hour ago

COMMENTS
There are no any comments
Write a comment