With the bale shredder, all bales except cotton bales can be shredded into bulk material.
Bale Shredder:
Construction Cost: $2500
Daily Costs: $10
Category: Productions
Configuration: None
Production Chains:
Bales to Bulk Material
Production:
Cycles/Month: 24,000
Cost/Active Hour: $240
- 0 Likes
- 0 Comments
- 76 Downloads
-
1 Downloads in
-
4 months ago

COMMENTS
There are no any comments
Write a comment